Blog Entry


The outside of the church has been receiving a major grooming and cleanup for the last few months.  Of course it would be right at this time that our long drought would end!  The workers have been creative in working around the raindrops.

One major issue that came to light during this work was the deterioration of the wooden understructure supporting the walkways around the center courtyard and the east courtyard (CFC play area).  Our contractor has been working feverishly to replace rotted wood and re-level the walkways, using wood that should be more resistant to moisture damage.

We hope to have things buttoned up before the Easter holidays.

Geoff Bryan

Property Moderator



Comments


No comments have been added. Add one below:


Add New Comment

Comment:


First Name:


Last Name:


Email:
(Optional: This will not be displayed on the website)


Facebook

FACEBOOK

Twitter

TWITTER

Instagram

INSTAGRAM

Toutube

YOUTUBE

Blog

BLOG

La Crescenta Presbyterian Church
2902 Montrose Ave
La Crescenta, CA 91214
818-249-6137

© Copyright 2015, LCPC, All Rights Reserved.

Top