Blog Entry


Take a walk to the back of the church (behind the Sanctuary) and see the new wall in its near-finished state.

The concrete work is done and the asphalt has been filled in and leveled.  We still need to re-stripe the parking spaces to coincide with the new work, and the outdoor lights need to be hooked up.  Also, the crash bar and lock hardware for the gate need to be installed.  But we're pretty far along and it should not be too much longer before it's all finished.

We owe many thanks for Duane Fernandez and Foster Dennis for all they have done to move this project forward.  

-- Geoff Bryan, Property Moderator 



Comments


No comments have been added. Add one below:


Add New Comment

Comment:


First Name:


Last Name:


Email:
(Optional: This will not be displayed on the website)


Facebook

FACEBOOK

Twitter

TWITTER

Instagram

INSTAGRAM

Toutube

YOUTUBE

Blog

BLOG

La Crescenta Presbyterian Church
2902 Montrose Ave
La Crescenta, CA 91214
818-249-6137

© Copyright 2015, LCPC, All Rights Reserved.

Top